No. |
Lecturer`s Name |
Title |
Publication |
Year |
1 |
Andryan Suhendra, Ir., MT, Amelia Makmur, ST., MT. |
Application of Geomembrane as Carbon Capture at Palm Oil Mill |
Proceedings of the International Symposium on Geoenvironmental Engineering in Hangzhou, China, September 8-10, 2009 |
2009 |
2 |
Andryan Suhendra, Ir., MT , Amelia Makmur, ST., MT. |
Composite Geotextile Reinforced Gabion Structure for River Side Slope of a Factory in Bali – Indonesia |
The First World Landslide Forum Proceeding, Tokyo – Japan, 18-21 November 2008, Hal. : 557-560 |
2008 |
3 |
Andryan Suhendra, Ir., MT |
Analysis The Influence of Stage Construction to Geotextile at Base of Embakment on Soft Soil using Plaxis 8.6 |
International Forum for Junior Civil Engineers Proceeding 2008 |
2008 |
4 |
Andryan Suhendra, Ir., MT |
Analysis of Slope Stability Reinforced by Soil Nailing using Plaxis 8.6 |
International Forum for Junior Civil Engineers Proceeding 2008 |
2008 |
5 |
Andryan Suhendra, Ir., MT |
Analysis of Geotextile Material Usage on Shallow Foundation to Improve its Bearing Capacity on Loose Sand |
International Forum for Junior Civil Engineers Proceeding 2008 |
2008 |
6 |
Made Suangga, Ir., MT., D.Eng. |
Pushover Analysis on Seismic Resistant Building Structure using Etabs Ver. 9 |
International Forum for Junior Civil Engineers Proceeding 2008 |
2008 |
7 |
Made Suangga, Ir., MT., D.Eng. |
Heat Hydration Analysis of Structure Pile Cap on Suramadu Bridge using Midas 7.0 |
International Forum for Junior Civil Engineers Proceeding 2008 |
2008 |
8 |
Amelia Makmur, ST., MT. |
Effectiveness Study for Additioning of Adhesive Agent into Asphalt Mixture |
International Forum for Junior Civil Engineers Proceeding 2008 |
2008 |
9 |
Juliastuti,Ir., MT |
Analysis Study of Drought Index Distortion Using Standardized Precipitation Index Methods at Brantas River Basin |
International Forum for Junior Civil Engineers Proceeding 2008 |
2008 |
10 |
Made Suangga, Ir., MT., D.Eng. |
Bored Pile Foundation of Main Suramadu Bridge |
Seminar Internasional Construction of Main Span Suramadu Bridge, pada tanggal 11-12 December 2007, Surabaya |
2007 |
Comments :