BINUS @
  • Greater Jakarta
  • Bekasi
  • Bandung
  • Malang
  • Semarang
BINUS Gallery
BINUS Gallery
  • More
BINUS 38th
Fauzi Khair, S.T., M.Sc.

Fauzi Khair, S.T., M.Sc.

D5821
Share to your friends

Products

IMPLEMENTATION OF WALKWAY PRODUCT QUALITY CONTROL AT PT. ABC USES THE DMAIC  METHOD

IMPLEMENTATION OF WALKWAY PRODUCT QUALITY CONTROL AT PT. ABC USES THE DMAIC METHOD

BiOn Industrial Engineering IMPLEMENTATION OF WALKWAY PRODUCT QUALITY CONTROL AT PT. ABC USES THE DMAIC METHOD
RANCANG BANGUN ALAT BANTU JIG UNTUK KALIBRASI DEPTH MICRO CHECKER MENGGUNAKAN METODE PDCA DENGAN MESIN UNIVERSAL LENGTH MEASURING DI PT KLM

RANCANG BANGUN ALAT BANTU JIG UNTUK KALIBRASI DEPTH MICRO CHECKER MENGGUNAKAN METODE PDCA DENGAN MESIN UNIVERSAL LENGTH MEASURING DI PT KLM

BiOn Industrial Engineering RANCANG BANGUN ALAT BANTU JIG UNTUK KALIBRASI DEPTH MICRO CHECKER MENGGUNAKAN METODE PDCA DENGAN MESIN UNIVERSAL LENGTH MEASURING DI PT KLM
Analisis Dampak Kualitas Layanan Terhadap Kepuasan Pelanggan di Industri Katering: Studi Kasus  PT Panganusa Aksara Kawa Menggunakan Metode SERVQUAL dan Importance-Performance Analysis (IPA)

Analisis Dampak Kualitas Layanan Terhadap Kepuasan Pelanggan di Industri Katering: Studi Kasus PT Panganusa Aksara Kawa Menggunakan Metode SERVQUAL dan Importance-Performance Analysis (IPA)

BiOn Industrial Engineering Analisis Dampak Kualitas Layanan Terhadap Kepuasan Pelanggan di Industri Katering: Studi Kasus PT Panganusa Aksara Kawa Menggunakan Metode SERVQUAL dan Importance-Performance Analysis (IPA)
Implementasi CVL dan NASA-TLX pada aktifitas Perawatan  Armada Pesawat Garuda Indonesia Dinas Line Maintenance  CGK PT. GMF AEROASIA, Tbk

Implementasi CVL dan NASA-TLX pada aktifitas Perawatan Armada Pesawat Garuda Indonesia Dinas Line Maintenance CGK PT. GMF AEROASIA, Tbk

BiOn Industrial Engineering Implementasi CVL dan NASA-TLX pada aktifitas Perawatan Armada Pesawat Garuda Indonesia Dinas Line Maintenance CGK PT. GMF AEROASIA, Tbk
Analisis Penerapan Total Productive Maintenance Menggunakan Overall Equipment Efectiveness Dan Failure Mode Effect Analisys Pada Mesin Leak Tester (Studi Kasus: Perusahaan Sistem Rem di Indonesia)

Analisis Penerapan Total Productive Maintenance Menggunakan Overall Equipment Efectiveness Dan Failure Mode Effect Analisys Pada Mesin Leak Tester (Studi Kasus: Perusahaan Sistem Rem di Indonesia)

BiOn Industrial Engineering Analisis Penerapan Total Productive Maintenance Menggunakan Overall Equipment Efectiveness Dan Failure Mode Effect Analisys Pada Mesin Leak Tester (Studi Kasus: Perusahaan Sistem Rem di Indonesia)
ANALISIS PENERAPAN CAPACITATED VEHICLE ROUTING PROBLEM (CVRP) PADA PT FAJAR MITRA INDAH (FAMILYMART) DENGAN METODE SAVING MATRIX, NEAREST NEIGHBOR DAN GRAVITY LOCATION

ANALISIS PENERAPAN CAPACITATED VEHICLE ROUTING PROBLEM (CVRP) PADA PT FAJAR MITRA INDAH (FAMILYMART) DENGAN METODE SAVING MATRIX, NEAREST NEIGHBOR DAN GRAVITY LOCATION

BiOn Industrial Engineering ANALISIS PENERAPAN CAPACITATED VEHICLE ROUTING PROBLEM (CVRP) PADA PT FAJAR MITRA INDAH (FAMILYMART) DENGAN METODE SAVING MATRIX, NEAREST NEIGHBOR DAN GRAVITY LOCATION
PENINGKATAN PRODUKSI NITROGEN CAIR PADA PLANT-39 DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS DI PT BADAK NGL

PENINGKATAN PRODUKSI NITROGEN CAIR PADA PLANT-39 DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS DI PT BADAK NGL

BiOn Industrial Engineering PENINGKATAN PRODUKSI NITROGEN CAIR PADA PLANT-39 DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS DI PT BADAK NGL
RELIABILITY TEST UNTUK GAME SMARTPHONE IMPROVEMENT MENGGUNAKAN DESIGN OF EXPERIMENT

RELIABILITY TEST UNTUK GAME SMARTPHONE IMPROVEMENT MENGGUNAKAN DESIGN OF EXPERIMENT

BiOn Industrial Engineering RELIABILITY TEST UNTUK GAME SMARTPHONE IMPROVEMENT MENGGUNAKAN DESIGN OF EXPERIMENT
Implementasi Lean Six SIgma - Final Presentation Industrial Practice Mahasiswa PJJ Teknik Industri  BINUS Learning oleh DIMAS HARIYADI NIM 2301965681

Implementasi Lean Six SIgma - Final Presentation Industrial Practice Mahasiswa PJJ Teknik Industri BINUS Learning oleh DIMAS HARIYADI NIM 2301965681

BiOn Industrial Engineering Implementasi Lean Six SIgma - Final Presentation Industrial Practice Mahasiswa PJJ Teknik Industri BINUS Learning oleh DIMAS HARIYADI NIM 2301965681
ANALISIS TECHNICAL DELAY TERHADAP DISPATCH RELIABILITY DAN IMPLEMENTASI PREVENTIVE MAINTENANCE (STUDI KASUS: MASKAPAI PENERBANGAN CITILINK) - Presentasi Akhir Kuliah Kerja Praktek Teknik Industri  BINUS Learning oleh I Gede Putu Supurna Yasa / 2301965662

ANALISIS TECHNICAL DELAY TERHADAP DISPATCH RELIABILITY DAN IMPLEMENTASI PREVENTIVE MAINTENANCE (STUDI KASUS: MASKAPAI PENERBANGAN CITILINK) - Presentasi Akhir Kuliah Kerja Praktek Teknik Industri BINUS Learning oleh I Gede Putu Supurna Yasa / 2301965662

BiOn Industrial Engineering ANALISIS TECHNICAL DELAY TERHADAP DISPATCH RELIABILITY DAN IMPLEMENTASI PREVENTIVE MAINTENANCE (STUDI KASUS: MASKAPAI PENERBANGAN CITILINK) - Presentasi Akhir Kuliah Kerja Praktek Teknik Industri BINUS Learning oleh I Gede Putu Supurna Yasa / 2301965662
Analisis Kinerja Coal Handling Facility di dalam Pengisian Coal Train pada Train Loading Station di PT Bukit Asam TBK

Analisis Kinerja Coal Handling Facility di dalam Pengisian Coal Train pada Train Loading Station di PT Bukit Asam TBK

BiOn Industrial Engineering Analisis Kinerja Coal Handling Facility di dalam Pengisian Coal Train pada Train Loading Station di PT Bukit Asam TBK
Analisis Penilaian Risiko dan Faktor Penyebab Kecelakaan Kerja Well Cementing Services (Studi Kasus: PT ING)

Analisis Penilaian Risiko dan Faktor Penyebab Kecelakaan Kerja Well Cementing Services (Studi Kasus: PT ING)

BiOn Industrial Engineering Analisis Penilaian Risiko dan Faktor Penyebab Kecelakaan Kerja Well Cementing Services (Studi Kasus: PT ING)
Usulan Mitigasi Kerusakan Komponen Pada Centrifugal Pump 5

Usulan Mitigasi Kerusakan Komponen Pada Centrifugal Pump 5

BiOn Industrial Engineering Usulan Mitigasi Kerusakan Komponen Pada Centrifugal Pump 5

BINUS Gallery

Copyright © BINUS Higher Education. All rights reserved